Georgia Tech Procurement Assistance Center

  • Home
  • About Us
  • Training
    • Class Registration
    • On-demand Training
    • GTPAC COVID-19 Resource Page
    • Cybersecurity
    • Veterans Verification Video
    • GTPAC Community
    • Other Training Audio & Video
  • Useful Links
  • Team Directory
    • Albany Counselor
    • Athens Counselor
    • Atlanta Counselors
    • Augusta Counselor
    • Carrollton Counselor
    • Columbus Counselor
    • Gainesville Counselor
    • Savannah Counselor
    • Warner Robins Counselor
  • Directions
    • Athens
    • Atlanta – Training Facility
    • Atlanta – Office
    • Albany
    • Augusta
    • Carrollton
    • Columbus
    • Gainesville
    • Savannah
    • Warner Robins
  • COVID-19
  • New Client Application
  • Contact Us

DLA to make major changes in contractor shipping requirements

July 1, 2013 By ei2admin

The Defense Logistics Agency (DLA) plans to make big changes in its contractor shipping requirements.  The changes will take place in October 2013, so if your business sells products to DLA, now is the time to get ready. 

DLA’s new shipping requirements are called First Destination Transportation (FDT), and the new rules apply to the movement of material from suppliers to the first military depot or direct to military customer.  In these instances, shipping will change from FOB destination to FOB origin.

  • FOB is an abbreviation for free on board.  This term is used with the designation of a physical point to determine the responsibility and basis for payment of freight charges and, unless otherwise agreed, the point at which Title for supplies passes to the buyer of consignee.  (The policies on designation of contracts as FOB Origin or FOB Destination are set forth in FAR 47.3.)
  • Irrespective of whether a contract is designated as FOB Origin or FOB Destination, the government bears the cost of shipping (either as part of the item price under FOB Destination or separately under FOB Origin).   An important consideration between the two designations, however, is who bears risk for damage or loss of the item during shipment.  Typically, under FOB Destination, the seller bears the risk of loss or damage to the item during shipment.  Under FOB Origin, the buyer typically bears the risk of loss or damage to the item during shipment.

Slated to begin with solicitations and awards in late October 2013, DLA’s new FDT rules will require the removal of transportation-related cost from contractor bids.  Shipping will be designated FOB Origin, thus contractors need only be concerned with quoting the associated costs of manufacturing their products.  Products affected by the October roll-out will be those labeled as Class IX consumables and some Class IV and VII materials to CONUS destinations. Supply Chains included in the FDT initiative are: Aviation, Land and Maritime, Construction and Equipment, and Industrial Hardware.

According to DLA, the new FDT rules mean that geography will no longer play a part in competitive bidding because distance-based shipping expenses will not have to be factored into bids.   The drawdown of troops from Afghanistan signals a reduction of necessary parts and supplies to U.S. troops.  Contractors who utilize this change in transportation terms, and find additional avenues for cutting costs, will find their reward in additional business opportunities.

In these uncertain budgetary times, DLA is challenged to decrease costs at the same time as being challenged with increased support to the troops in both the U.S. and abroad.  It is DLA’s goal to take control of its supply chain by improving in-transit visibility (ITV) and dock productivity as well as safety stock requirements.  ITV offers opportunities to consolidate.  Loading fewer, fuller trucks increases DLA’s effectiveness and reduces its carbon footprint.

Once the FDT rules become effective, vendors are advised that before  submitting a bid (minus the cost of transportation), they will need to Log In and subscribe to DLA’s Vendor Shipment Module (VSM).   VSM is the vehicle by which vendors will notify DLA’s transportation team that a shipment is ready for pick up.  No matter the size or weight, VSM will assess the information provide by vendors, assign the carrier best suited for the shipment, and notify the vendor of the carrier choice. At that time, VSM will allow each vendor to access its own contract information in order to print a commercial bill of lading, military shipping labels, packing slip, address labels and small parcel carrier labels.

For VSM registration and instruction, please click on the link below.   A Help Desk is available and can be reached by email at delivery@dla.mil or by phone Monday through Friday, between the hours of 6:00 am and 6:30 pm Eastern Time, at 800-456-5507.

Will you be ready for this change in October 2013?  Now is the time to register for VSM:  https://vsm.distribution.dla.mil/   Watch for solicitations that use the freight term FOB Origin, and don’t forget to sharpen your pencil!

For more information on FDT, visit: http://www.dla.mil/FDTPI/Pages/default.aspx#transportation.

Filed Under: Contracting Tips Tagged With: competitive bid, cost, cost reduction, DLA, First Destination Transportation, FOB destination, FOB origin, shipping

Recent Posts

  • DLA hosting event March 10th with special emphasis on Women-Owned Small Businesses
  • Navy Office of Small Business Programs holding three events in March
  • SBA hosting conversations with contracting officers forum Feb. 25th
  • Final rule, formal training on CMMC could hit this summer
  • Non-compete clauses in government contracting: a case study in enforceability

Popular Topics

8(a) abuse Army bid protest budget budget cuts certification construction contract awards contracting opportunities cybersecurity DoD DOJ False Claims Act FAR federal contracting federal contracts fraud GAO Georgia Tech government contracting government contract training government trends GSA GSA Schedule GTPAC HUBZone innovation IT Justice Dept. marketing NDAA OMB SBA SDVOSB set-aside small business small business goals spending subcontracting technology VA veteran owned business VOSB wosb

Contracting News

Final rule, formal training on CMMC could hit this summer

COFC: “Rule of two” must be analyzed before “any” acquisition

DOD’s cybersecurity certification requirements to appear in DHS contracts

Congressional Research Service publishes updated report on SBA’s 8(a) program

Congressional Research Service publishes new report on SBA’s HUBZone program

Read More

Contracting Tips

Non-compete clauses in government contracting: a case study in enforceability

NDAA for fiscal year 2021 includes numerous provisions impacting government contractors

Beware of the automated email response

Complying with the government’s restrictions on foreign telecommunications equipment

Construction claims in the COVID era: lessons learned and best practices

Read More

GTPAC News

DLA hosting event March 10th with special emphasis on Women-Owned Small Businesses

Navy Office of Small Business Programs holding three events in March

SBA hosting conversations with contracting officers forum Feb. 25th

USACE seeks vaccination center construction support

GTPAC updates cybersecurity resource page to include CMMC guidance

Read More

Georgia Tech News

Collective worm and robot “blobs” protect individuals, swarm together

The Partnership for Inclusive Innovation is now accepting applications for pilot programs

Georgia Tech will help manage DOE’s Savannah River National Laboratory

Dr. Abdallah testifies on U.S. competitiveness, research, STEM pipeline at Congressional hearing

Georgia Tech’s Technology Square Phase III to include George Tower

Read More

  • SAM.gov registration is free, and help with SAM is free, too
APTAC RSS Twitter GTPAC - 30th Year of Service

Copyright © 2021 · Georgia Tech - Enterprise Innovation Institute